top of page
Search

Major Updates to NFPA 241: 2022 Edition

The 2022 edition of NFPA 241, "Standard for Safeguarding Construction, Alteration, and Demolition Operations," introduces significant updates aimed at enhancing fire safety during construction activities. This article summarizes the key changes and their implications for stakeholders.

 

Structural Changes and General Requirements


One of the most notable updates in the 2022 edition is the restructuring of content for better clarity and usability. Previously scattered provisions have been consolidated into Chapter 4, which now covers a comprehensive range of general requirements. This chapter includes extensive guidelines on sprinkler coverage, standpipes, fire pumps, and other critical fire safety systems. The intent behind this reorganization is to centralize critical information, making it easier for users to navigate and comply with the standards.

 

Sprinkler and Standpipe Requirements


A significant focus of the new edition is on the use of temporary sprinklers during construction. The standard now provides clearer guidance on when and how these systems should be implemented. The decision to require temporary sprinklers is largely influenced by the fire prevention program's assessment, which must consider various factors such as the presence of combustible materials and heat sources. This approach aims to offer flexibility while ensuring adequate fire protection measures are in place.

 

Introduction of Chapters 12 and 13


The 2022 edition includes two new chapters that address specific types of construction and these chapters are designed to address the unique fire risks associated with these construction types and provide clear, actionable guidelines for managing those risks.:

  • Chapter 12: Covers tall mass timber construction, detailing the requirements for safeguarding these increasingly popular building types.

  • Chapter 13: Focuses on large wood frame structures, providing guidelines for fire safety measures tailored to these buildings. This chapter is especially relevant for traditional stick-built constructions that extend beyond typical heights and areas.

 

Fire Prevention Program Manager (FPPM) Roles


The roles and responsibilities of the Fire Prevention Program Manager (FPPM) have been more clearly defined in this edition. This role is critical in ensuring that all fire safety measures are properly planned, implemented, and maintained throughout the construction process. The updated standard outlines the knowledge and qualifications required for FPPMs, ensuring that they are equipped to manage fire risks effectively.


Fire Exposure Analysis (FEA)


A new requirement for conducting a Fire Exposure Analysis (FEA) has been introduced. This analysis assesses the potential fire risks to adjacent properties and structures and helps in planning appropriate fire safety measures to mitigate these risks. The FEA is intended to provide a scientific basis for determining the necessary precautions and protective measures during construction.

 

Site Access and Firefighter Marking Systems


Enhancements have been made to the requirements for site access and marking systems to ensure that emergency responders have the information they need to respond effectively to construction site fires. This includes improved guidelines for marking buildings under construction with relevant fire safety information, helping firefighters quickly assess risks and make informed decisions during emergencies.

 

Guard Services and Hot Work Protocols


The standard has also introduced stricter protocols for guard services and hot work operations. Guard services are now required in specific scenarios to monitor and respond to potential fire hazards, particularly in large wood frame and tall mass timber constructions. Additionally, hot work protocols have been extended to include longer fire watch periods to ensure that any residual heat sources do not ignite fires after work has been completed.

 

Conclusion


The 2022 edition of NFPA 241 represents a comprehensive update to fire safety standards for construction, alteration, and demolition operations. By consolidating requirements, introducing new chapters, and clarifying roles and responsibilities, the updated standard aims to enhance fire safety and provide clearer guidance to all stakeholders involved in construction projects. These changes are expected to improve the implementation of fire safety measures and reduce the risk of fire-related incidents on construction sites.

Recent Posts

See All

Comments


bottom of page